Saturday, April 21, 2007

Day Two

The finished foundation: pressure treated beams over a
bed of crushed stone. Level and even, a little tougher
than you might think. Add moving all that lumber to the
site by hand, and I had a long day. Water consumed: 1.5
gallons.
So tired. These picture do not relate the 10-12 hours of
wild turkey chasing that preceded them.


I built a small retaining wall of fieldstone.


tired puppy




Still a lot to do.

No comments: